DualTemp Clauger Logo
Posted on: January, 2020

OBJECTIVE

To ensure safety by checking and preventing the accumulation of refrigerant in the machinery room due to a leak to a concentration that would be flammable, harmful or result to oxygen deprivation.

REQUIREMENTS

Based on the ANSI/IIAR-2 2014, the requirements for the machinery room is broken down into three categories:
1. Design and installation
2. Control
3. Testing